| Technical Data | |
| Base | Polymer modified pozzolanic cementitious |
| Color | Tan |
| Mixing Ratio | 50 lb Bag / 1 gal water + ½ gal P-100 Primer Refer to Mixing Instructions |
| Working Time | 10-15 minutes at 72°F Working time will vary with ambient conditions, water ratio and temperature. |
| Set Time | Initial Set - 100 minutes Final Set - 2 to 4 hours Most flooring can be installed 16 to 24 hours after F-10 is poured. |
| Comprehensive Strength | 24 hour - 1040 psi 7 day - 2900 psi 28 day - 5100 psi 28 day - 5200 psi (with admixture) ASTM C-109 |
| Absorption Rate | 24 hour - 5.3% ASTM C-67 |
| Flexural Strength | 24 hour - 910 psi ASTM C-348 |
| Coverage | 46-50 sq. ft. per 50 lb of powder with 1/8" thickness. |
| Packaging | 50 lb. bags |
| Shelf Life | 6 months if stored in a cool, dry location. Keep bags tightly sealed when not in use. |
| Note | Contains no asbestos or portland cement. Made with post-industrial recycled fly ash |
Products designed with the environment in mind.
For more information, click here.
A polymer modified, pozzolan based cementitious type material which requires the addition of clean water to produce a fast setting, dimensionally stable, high strength underlayment. Poz-Patch 100 is a trowelable product that can be applied from featheredge to 1½" thickness in one application. Poz-Patch 100 can be used on, below and above grade as an exterior or interior underlayment for carpeting, vinyl, ceramic tile, asphalt, wood flooring and other compatible coverings.
* Super Fast Installation
* High Compressive Strength
* 1½" Featheredge
Limitations
Apply only at temperatures between 50°F and 95°F. Do not use over unstable materials. DO NOT USE ON WOOD SUBFLOOR.
Surface Preparations
All subfloors must be sound, solid, dry, clean and free from dust, oil, grease, paint, wax, curing agents, sealers, release agents, or any deleterious substance which may act as a bond barrier.
Mixing
Electric Drill: Pour 2 quarts of clean water in a clean mixing container and mix while adding entire contents of this 17 ½ lbs. bag of Poz-Patch 100. Mix thoroughly with a heavy duty drill and mixer blade for 1 to 2 minutes to achieve a smooth, trowelable, homogeneous consistency. Do not over mix or entrap air in the material.
Hand Mixing: If less than a full bag is needed, place the desired amount of Poz-Patch 100 in a clean mixing container. While mixing by hand, add water until a desired trowelable, lump free consistency is achieved. The recommended mixing ratio is 3½ parts powder to 1 part water by volume. DO NOT OVER-WATER! Poz-Patch 100 is not to be used as a self-leveling underlayment.
Mix only the amount of material that can be applied in 10 to 15 minutes. After mixing with water, material normally hardens in 45 to 60 minutes. Do not re-temper. Any variation in the recommended quantity of water will affect the working and performance characteristics of the mix. It is recommended that a test be made to determine the suitability of this product for its intended use.
Application
Mix only the amount of material that can be applied in 10 to 15 minutes. After mixing with water, material normally hardens in 45 to 60 minutes. Do not re-temper. Any variation in the recommended quantity of water will affect the working and performance characteristics of the mix. It is recommended that a test be made to determine the suitability of this product for its intended use.
Caution
Mix only the amount of material that can be applied in 10 to 15 minutes. After mixing with water, material normally hardens in 45 to 60 minutes. Do not re-temper. Any variation in the recommended quantity of water will affect the working and performance characteristics of the mix. It is recommended that a test be made to determine the suitability of this product for its intended use.
Documentation
Some documents require Adobe Reader If you've not yet installed Adobe Reader on your computer, click here to download and install it.






